SGLI Presentations
- Over 6 years observation of GCOM-C/SGLI sensor (APOLO-2024, November 18, 2024)
- Five year operation of a cooler Dewar assembly for infrared scanner on board GCOM-C (Cryogenics, Available online 1 March 2024)
- GCOM-C Status (The Joint PI Meeting of JAXA Earth Observation Missions FY2023, November 6, 2023)
- GCOM-C Status (The Joint PI Meeting of JAXA Earth Observation Missions FY2022, November 9, 2022)
- Introduction of GCOM-C by JAXA (in Japanese) (Space / Astronomical Optics Seminar, April, 2022)
- GCOM-C Status (The Joint PI Meeting of JAXA Earth Observation Missions FY2021, January 20, 2021)
- Introduction of GCOM-C data usage system by JAXA (in Japanese) (The 71st (Autumn 2021) Conference of the Remote Sensing Society of Japan, November 15, 2021)
- GCOM-C Status (The Joint PI Meeting of JAXA Earth Observation Missions FY2020, January 18, 2021)
- GCOM-C Status (The Joint PI Meeting of JAXA Earth Observation Missions FY2019, Tokyo, January 22, 2020)
- SGLI Lunar Calibration Evaluation (3rd Lunar Calibration Workshop, November 17, 2020)
- In-Orbit Observation of the Second Generation Global Imager (SGLI) and Study towards Follow-on Imaging Radiometer (IGARSS 2019 Yokohama, August 2, 2019)
- Lunar Calibration Inter-Comparison of SGLI, MODIS and VIIRS (IGARSS 2019 Yokohama, August 1, 2019)
- On-orbit operation results of GCOM-C/SGLI (in Japanese) (62th meeting of the Japanese Society for Aeronautical and Space Sciences, Fukuoka, Oct. 26, 2018)
- First year on-orbit calibration activities of SGLI on GCOM-C satellite (SPIE Asia-Pacific, Hawaii, Sep. 26, 2018)
- Pre-launch characterization and in-orbit calibration (IGARSS 2018 Valencia,July 26, 2018)
- Pre-launch characterization and in-orbit calibration (IGARSS 2018 Valencia,July 26, 2018)
- Radiometric performance of SGLI (SPIE 2016 Edinburgh, Sep. 26, 2016)
- SGLI Development Status: VNR sensor (SPIE Asia-Pacific, New Delhi, Apr. 4-7, 2016)
- SGLI Development Status: IRS sensor (SPIE Asia-Pacific, New Delhi, Apr. 4-7, 2016)
- SGLI Development Status: VNR sensor (SPIE Asia-Pacific, Beijing, Oct. 14, 2014)
- SGLI Development Status: IRS sensor (SPIE Asia-Pacific, Beijing, Oct. 14, 2014)
- SGLI Development Status (GCOM PI Workshop, Tokyo, Jan. 16, 2014)
- Narrow-band optical filters for SGLI
- SGLI EM testing results (SPIE, Kyoto, Nov. 1, 2012)
- SGLI Operation Concept (SPIE, Incheon, Oct. 13, 2010)
- SGLI Development Status (GCOM PI Workshop, Tokyo, Jan. 13, 2010)
- SGLI Development Status (SPIE, Berlin, Sep. 2, 2009)
Links